References

Municipal Waste to energy ,  Biological Drying Facility,   Mechanical Fabrication and Installation

 ISTANBUL

COMPLETED WORKS: 30.000 m2 closed area and established a total of 35 (10 m X 50 m) on the pool of Domestic Waste in Biological Drying Facility:

– VENTILATION SYSTEMS AND MECHANICAL WORKS:

Phase 1,   3.2 km HDPE pipes (225-110 mm) and mounting it on about 28,800 pieces of HDPE pipes with electrofusion welding ventilation nozzles; 24 mechanical installation works of the aerators

– MEMBRANE SYSTEM ACCESSORIES – MECHANICAL WORKS:

Phase 1 scope of work in ingredients as membrane tensioning system of the 1.2 km of wire rope mechanical assemblies and accessories.

– MECHANICAL MANUFACTURING AND INSTALLATION OF INFRASTRUCTURE WORKS LINE:

In approximately 2 km long covered stage works 160 – in diameters from 110 mm PN16 PE100 pipes with 110-63 mm diameter in PN 8 PE100 fire and use water pipes lines-material machining and assembly jobs.

 

Sodium Feldspar Plant  – Steel Fabrication  and  Mechanical Works

AYDIN

COMPLETED WORKS:  20.000 m2 indoor total of 225.000 m2 land board crushing-screening, flotation, grinding and drying facilities in:

– STEEL CONSTRUCTION AND ROOF COATING MANUFACTURING AND INSTALLATION WORKS:

China has an indoor tank with structural steel fabrication and roof panel sheathing perimeter of the panel assemblies

– OCCUPATIONAL SAFETY AND INSTALLATION WORKS STEEL PRODUCTION PLATFORMS:

Grid platforms in China and grave site, railings, stairs steel manufacturing, assembly and epoxy paint jobs

– Sprinkler systems MECHANICAL WORKS

Displacement and restoration of works of Plant Sprinkler systems in Gulluk

– VARIOUS REFURBISHMENT WORKS:

Çine and Türbe sites  piping, conveyor belts, screens, mills, dynamos, the flotation vb.ekip-ekipmana all kinds of renovations and refurbishment works

 

Past Projects:

Municipal Waste to energy,   Biological Drying Facility Mechanical Fabrication and Erection Works

ISTANBUL

COMPLETED WORKS: 1.500 m2 closed area and established a total of 4 pieces (8 m X 25 m) on the pool of Domestic Waste in Biological Drying Facility:

– VENTILATION SYSTEMS  AND MECHANICAL WORKS:

500 m ventilation ducts and pipes (between 225 -110 mm) mounting on HDPE pipes of around 600 works of mechanical ventilation nozzles; 4 mechanical works of aerators

– MEMBRANE SYSTEM ACCESSORIES MECHANICAL WORKS:

Mechanical works as a membrane of 200 mt of steel rope tensioning system and accessories.

– SPREADING WINDING MACHINE INSTALLATION WORKS:

About 80 mt rail system of membrane winding machine paving welded assemblies